Guireg Capitaine

The Engineer
An experienced software engineer, Guireg has put his passion for technology and his technical expertise at the service of seafarers, designing and building software that performs and deploys fast. 

Blog Posts

Offshore Wind Support Vessels: Managing CTV and SOV Maintenance

On a CTV or an SOV, maintenance does not only protect the vessel: it protects the day rate. Duty cycle, structural fatigue, motion-compensated gangways, weather windows, the traceability charterers demand and the contractual KPIs — a practical guide to protecting the availability of your offshore wind support fleet.

Read Story

Vessel Fuel Consumption Monitoring: Methods, Sensors and KPIs to Cut OPEX

Fuel is a vessel's largest variable OPEX line. Compare the three measurement methods — tank soundings, volumetric and Coriolis flow meters, running hours — with their real accuracy and traps. Bunker quantity control, data structuring, g/kWh KPIs and alert thresholds that turn consumption into a machinery diagnostic tool.

Read Story

Excel vs Maritime CMMS: The Real Cost of Running Fleet Maintenance on Spreadsheets

Spreadsheets still run maintenance on thousands of ships, and for good reason: free, familiar, flexible. But past the third vessel, diverging versions, lost history, missed certificate dates and unreliable stock cost far more than software. Breaking points, comparison table, cost calculation and a clean migration path.

Read Story

Maritime Cyber Security: What IACS UR E26/E27 and IMO Rules Mean for Your Maintenance

The IMO has required cyber risk in the SMS since 2021, and IACS UR E26 and UR E27 apply to ships contracted for construction from 1 July 2024. Here is the framework that actually applies, the evidence your technical department must produce, and how a CMMS delivers it on audit day.

Read Story

CMMS Rollout on Board: The Six Mistakes That Sink the Project

A CMMS rollout does not fail on go-live day: it drifts three to six months later, quietly. Six failure modes seen on vessels in service, from the maker's programme loaded unedited to ticked boxes that prove nothing in an ISM audit. For each one, the symptom, the real cause and the fix.

Read Story

Maritime CMMS Implementation Checklist: Phase by Phase, Ship by Ship

A CMMS rollout at sea runs on port calls, dry-dockings and crew changes, not on an office project plan. This is the chronological checklist, phase by phase: what has to be dealt with, who does it ashore and on board, what gets delivered, and the criterion that says a phase is finished. Every table is on the page.

Read Story